WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
Burlington Resources Secures 5 New McKenzie County Permits in Single Section - Bakken Wire
Daily Activity

Burlington Resources Secures 5 New McKenzie County Permits in Single Section

DMR report shows operator targeting HBU Sandstone with multi-well pad; XTO renews Williams County permit.

Bakken Wire Staff·☀️Morning Wire·

The North Dakota Department of Mineral Resources approved five new drilling permits on Tuesday, all filed by Burlington Resources Oil & Gas Company LP for a single location in McKenzie County.

All five permits are for the HBU Sandstone formation within the confidential 'CONFIDENTIAL' field. The permits are for wells named HBU SANDSTONE 5N MBH, 4N MBH, 3N MBH, 2N MBH, and 6S MBH. They are all located at SE SE 15-148N-98W in McKenzie County, indicating a concentrated multi-well pad development.

This activity underscores continued operator focus on the core Bakken region of McKenzie County, which has long been the state's top-producing area for oil and gas.

In other permitting activity, the DMR processed one permit renewal. XTO Energy Inc. renewed permit #37783 for the ROUST 34X-7C well, located at SW SE 7-154N-95W in Williams County within the 'HOFFLUND' confidential field. The filing notes the well is a "PROPOSED DRILLBACK OUTSIDE OF SPACING UNIT."

The DMR's daily report also included an update for an existing confidential status filing. The entry for Oasis Petroleum North America LLC's STORHAUG 5700 42-23 4B well, located at SE SW 23-157N-100W in Williams County, was listed under "ADDITIONAL INFORMATION."

The day's filings show Burlington Resources as the most active operator in the report, securing all five of the newly approved permits. The concentrated nature of the permits in a single section suggests efficient pad-based development planning, a common strategy in the Bakken to reduce surface footprint and operational costs.

While the specific target formation, HBU Sandstone, is listed, the wells' confidential status means detailed production forecasts and specific reservoir data are not publicly disclosed. Confidential status is typically granted for initial exploratory wells or to protect competitive operational data.

The XTO renewal and the Oasis update indicate ongoing administrative and planning work by other major operators in the neighboring Williams County, which along with McKenzie County forms the heart of the Williston Basin's Bakken production.

Source

North Dakota Department of Mineral Resources Daily Activity Report for Tuesday, August rowspan="1" 11, 2026.

dmrdrilling permitsburlington resourcesmckenzie countyxto energywilliams countybakken

Share this article

Related Articles

DMR Daily Activity Report Shows No New Filings for Saturday - Bakken Wire
Daily Activity

DMR Daily Activity Report Shows No New Filings for Saturday

The North Dakota Department of Mineral Resources (DMR) reported no new activity in its daily filing report for Saturday, November 21, 2026. The daily report, a key source of operational intelligence for the Bakken, typically lists new drilling permits issued, well spud dates, completion reports, and notices of plugged wells. The absence of new filings is a normal occurrence, particularly on weekends and holidays when state offices are closed and operator paperwork submissions slow. The DMR's daily activity report provides a near-real-time snapshot of industry movement. Consistent periods without filings can indicate administrative lags or planned pauses in field operations. The last reported activity will remain the most current data until the next report is issued. Bakken Wire will monitor for the next scheduled update from the North Dakota DMR.

☀️Morning Wire·Nov 22
Daily Activity

DMR Approves Five New Permits Led by EOG; Continental Renews Four

The North Dakota Department of Mineral Resources approved five new permits and seven renewals in its latest daily activity report, with EOG Resources leading new drilling plans in Mountrail County. EOG Resources secured four of the five new permits approved yesterday, all targeting the Alger field in Mountrail County. The permits are for the COTTONWOOD 104-0522H, COTTONWOOD 18-0522H, COTTONWOOD 105-0523H, and COTTONWOOD 21-0523H wells. The fifth new permit was issued to HYDRA SERVICES, LLC for the MARTIAN 32-5H SWD, a saltwater disposal well in McKenzie County. The report also listed seven permit renewals. Continental Resources, Inc. renewed four permits for proposed drillbacks outside of spacing units in the Epping field of Williams County. The renewed permits are for the SODBUSTER 2-6HSL, SODBUSTER 4-6H, SODBUSTER 6-6H, and SODBUSTER 7-6H1 wells, all located in Lot 3 of Section 6-155N-99W. Three permit cancellations were filed by Whiting Oil and Gas Corporation, all for...

☀️Morning Wire·Nov 21
Daily Activity

Koda Resources Permits Three New Wells in Divide County; Continental Leads Renewals

The North Dakota Department of Mineral Resources approved three new drilling permits and renewed 24 in its latest daily activity report. All new permits were issued to Koda Resources Operating LLC for wells in Divide County. The newly approved permits are for the AMBER 2104-7BH, AMBER 2133-3BH, and AMBER 2134-4BH wells, all located in the Fertile Valley field within Divide County, according to the DMR report. Continental Resources, Inc. dominated the renewal activity, accounting for 21 of the 24 renewed permits. The renewals span several key Bakken counties and fields. In Divide County's Sadler field, Continental renewed permits for six wells: the ELVEIDA 4-28H, ELVEIDA 3-28H1, ELVEIDA 2-28H, BLISS 2-21H, BLISS 3-21H1, and BLISS 4-21H. Four of these filings were marked as 'Confidential'. In McKenzie County, Continental renewed permits for eight wells. These include the LANCASTER 5-28H, LANCASTER 4-28H1, LANCASTER 7-28H, and LANCASTER 6-28H1 in the Elk field, and the...

☀️Morning Wire·Nov 20