WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
Daily DMR Report: Three New Permits Approved, Seven Renewed - Bakken Wire
Daily Activity

Daily DMR Report: Three New Permits Approved, Seven Renewed

Hess and Burlington Resources secure new drilling permits, while Foundation Energy dominates renewals, including several outside standard spacing units.

Bakken Wire Staff·☀️Morning Wire·

The North Dakota Department of Mineral Resources approved three new drilling permits and renewed seven others in its latest daily activity report. The new permits were filed by Hess Bakken Investments II and Burlington Resources Oil & Gas Company LP.

Hess Bakken Investments II received permit #42852 for the RS-PIEPKORN-155-92-1208H-3 well in Mountrail County's Stanley field. Burlington Resources secured two permits, #42853 for the CLEMENS 2E-TFH and #42854 for the DEMICKS LAKE 2D-TFH, both located in the same section (SE SW 07-151N-96W) in McKenzie County. According to the DMR report, both Burlington permits are listed for a 'CONFIDENTIAL' field.

The activity highlights continued, though modest, new permitting in the core Bakken counties of McKenzie and Mountrail. All three new permits are for horizontal wells, indicating planned development drilling.

Foundation Energy Management, LLC was the most active operator in the report, accounting for all seven permit renewals. The renewals, numbered #28010, #30806, #30807, #33377, #33378, #33379, and #33380, are concentrated in Billings County. The wells are located in the Roosevelt, Morgan Draw, and Elkhorn Ranch fields.

Notably, five of the seven renewed permits for Foundation Energy include the designation "LOCATION OUTSIDE OF SPACING UNIT," with one (#30807) specifically noted as a "PROPOSED DRILLBACK OUTSIDE OF SPACING UNIT." This indicates the company is securing approvals for wells that deviate from the standard 1280-acre drilling units, potentially targeting different formations or optimizing existing pad development.

The DMR report also included additional information for two previously filed permits. Permits #41789 and #41790, for XTO Energy Inc's GBU APOLLO 14X-12H-S and GBU APOLLO 14X-12G-S wells in Williams County's Grinnell field, were listed, though no specific status change was detailed in the provided data.

The daily filing data provides a snapshot of administrative activity, where renewal applications often outnumber new permits. The concentration of renewals for Foundation Energy in Billings County suggests ongoing project planning in the southwestern extent of the Bakken play.

Source

North Dakota Department of Mineral Resources Daily Activity Report

dmrdrilling permitshessburlington resourcesfoundation energyxto energymckenzie countymountrail countybillings countyspacing units

Share this article

Related Articles

DMR Daily Activity Report Shows No New Filings for Saturday - Bakken Wire
Daily Activity

DMR Daily Activity Report Shows No New Filings for Saturday

The North Dakota Department of Mineral Resources (DMR) reported no new activity in its daily filing report for Saturday, November 21, 2026. The daily report, a key source of operational intelligence for the Bakken, typically lists new drilling permits issued, well spud dates, completion reports, and notices of plugged wells. The absence of new filings is a normal occurrence, particularly on weekends and holidays when state offices are closed and operator paperwork submissions slow. The DMR's daily activity report provides a near-real-time snapshot of industry movement. Consistent periods without filings can indicate administrative lags or planned pauses in field operations. The last reported activity will remain the most current data until the next report is issued. Bakken Wire will monitor for the next scheduled update from the North Dakota DMR.

☀️Morning Wire·Nov 22
Daily Activity

DMR Approves Five New Permits Led by EOG; Continental Renews Four

The North Dakota Department of Mineral Resources approved five new permits and seven renewals in its latest daily activity report, with EOG Resources leading new drilling plans in Mountrail County. EOG Resources secured four of the five new permits approved yesterday, all targeting the Alger field in Mountrail County. The permits are for the COTTONWOOD 104-0522H, COTTONWOOD 18-0522H, COTTONWOOD 105-0523H, and COTTONWOOD 21-0523H wells. The fifth new permit was issued to HYDRA SERVICES, LLC for the MARTIAN 32-5H SWD, a saltwater disposal well in McKenzie County. The report also listed seven permit renewals. Continental Resources, Inc. renewed four permits for proposed drillbacks outside of spacing units in the Epping field of Williams County. The renewed permits are for the SODBUSTER 2-6HSL, SODBUSTER 4-6H, SODBUSTER 6-6H, and SODBUSTER 7-6H1 wells, all located in Lot 3 of Section 6-155N-99W. Three permit cancellations were filed by Whiting Oil and Gas Corporation, all for...

☀️Morning Wire·Nov 21
Daily Activity

Koda Resources Permits Three New Wells in Divide County; Continental Leads Renewals

The North Dakota Department of Mineral Resources approved three new drilling permits and renewed 24 in its latest daily activity report. All new permits were issued to Koda Resources Operating LLC for wells in Divide County. The newly approved permits are for the AMBER 2104-7BH, AMBER 2133-3BH, and AMBER 2134-4BH wells, all located in the Fertile Valley field within Divide County, according to the DMR report. Continental Resources, Inc. dominated the renewal activity, accounting for 21 of the 24 renewed permits. The renewals span several key Bakken counties and fields. In Divide County's Sadler field, Continental renewed permits for six wells: the ELVEIDA 4-28H, ELVEIDA 3-28H1, ELVEIDA 2-28H, BLISS 2-21H, BLISS 3-21H1, and BLISS 4-21H. Four of these filings were marked as 'Confidential'. In McKenzie County, Continental renewed permits for eight wells. These include the LANCASTER 5-28H, LANCASTER 4-28H1, LANCASTER 7-28H, and LANCASTER 6-28H1 in the Elk field, and the...

☀️Morning Wire·Nov 20