WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
DMR Approves 8 New Permits; XTO Energy Files 7 in McKenzie County - Bakken Wire
Daily Activity

DMR Approves 8 New Permits; XTO Energy Files 7 in McKenzie County

EOG Resources also secures a permit in Mountrail County as daily permitting activity continues in the Bakken.

Bakken Wire Staff·☀️Morning Wire·

The North Dakota Department of Mineral Resources approved eight new drilling permits on Friday, April 10, 2026, according to the agency's daily activity report. The new authorizations highlight continued activity in the core Bakken counties.

XTO Energy Inc. was the most active operator, filing for and receiving seven permits. All seven are for the 'GBU Dionysus Federal' project located in McKenzie County. The permits are for wells 32X-14A, 32X-14B, 32X-14C, 32X-14D, 32X-14F, 32X-14G, and 32X-14H. The filings indicate a significant multi-well pad development, as all seven permits list the same legal location: the Southwest Quarter of the Northeast Quarter of Section 14, Township 153 North, Range 96 West.

Notably, the field name for all seven XTO Energy permits is listed as 'CONFIDENTIAL,' a designation sometimes used by operators for projects in early development stages. The concentration of activity in a single section underscores the continued focus on dense infill drilling and pad development to maximize resource recovery in the Bakken formation.

The remaining permit approved Friday was for EOG Resources, Inc. The permit, #42828, is for the well named 'Parshall 440-0207H' in Mountrail County. This well is located in the established Parshall field, an area that has been a prolific producer in the Bakken for many years.

The day's permitting data shows all new activity is concentrated in two of North Dakota's top oil-producing counties. McKenzie County consistently leads the state in production and active rig count, while Mountrail County also remains a core area for development. The approval of eight permits in a single day represents steady administrative activity for the state's oil regulator.

No other categories, such as permits applied for, wells spudded, or wells completed, were reported in the DMR's daily filing for April 10. The report provides a snapshot of the earliest stage of the drilling process, indicating where operators are preparing for future drilling campaigns.

Source

North Dakota Department of Mineral Resources Daily Activity Report for April 10, 2026.

dmrdrilling permitsxto energyeog resourcesmckenzie countymountrail countybakken

Share this article

Related Articles

Daily Activity

Nine New Bakken Permits Approved, Led by Kraken and Murex

The North Dakota Department of Mineral Resources approved nine new drilling permits on Tuesday, October 6, according to its daily activity report. The bulk of the new permits were filed by Kraken Operating LLC and Murex Petroleum Corporation. Kraken Operating LLC secured four permits for its "BUBBA" project in McKenzie County, all within a confidential field. The permits are for BUBBA 14-11-2 3H, 4H, 5H, and 6H. Murex Petroleum Corporation was approved for four permits in Divide County. Two are in the Alkabo field (BR-CJ HANA 36-24H MB and BR-DANI AUTUMN 36-24H MB) and two are in the Daneville field (BR-MICAH ANDREW 1-13H MB and BR-WANDA JUNE 1-13H MB). The ninth permit went to Koda Resources Operating LLC for the AMBER 1705-6BH well in Divide County's Fertile Valley field. In other activity, several previously confidential wells were released from that status. According to the report, three Hess Bakken Investments II,...

☀️Morning Wire·Oct 7
Daily Activity

Oasis Petroleum Leads Daily Permitting with Six New Dunn County Wells

The North Dakota Department of Mineral Resources approved six new drilling permits on Monday, October 5, 2026, all filed by Oasis Petroleum North America LLC. According to the DMR Daily Activity Report, all six permits are for wells in the Murphy Creek field of Dunn County. The approved permits include four wells on the Potter pad (43369, 43370, 43371, 43372) and two wells on the Weasley pad (43373, 43374). All six permits are located at NE SE 29-145N-95W, indicating a concentrated development plan by the operator in that specific section. Three existing permits were also renewed. According to the report, Formentera Operations, LLC renewed its permit for the RANGER 3328-3TFH well in Lot 4, Section 4-162N-98W, Divide County, Blooming Prairie field. The permit is listed as ‘CONFIDENTIAL’ and its location is noted as being outside of a spacing unit. Two permits held by Koda Resources Operating, LLC in Divide County...

☀️Morning Wire·Oct 6
Daily Activity

DMR Daily Activity Report Shows No New Permits or Filings Sunday

No new oil and gas activity was recorded in North Dakota’s official daily report for Sunday, October 4, according to the state Department of Mineral Resources. The DMR's daily activity report, which tracks regulatory filings from operators, contained no new permits, well completions, spud reports, or notices of plugged wells. The daily report is a key source for tracking near-real-time operational activity in the Bakken formation and broader Williston Basin. It typically includes new permits approved for drilling, notices that a well has been spudded (drilling commenced), reports of well completions (when a well is finished and ready for production), and official notifications of well plugging. Days with no new filings are a normal occurrence in the state's reporting system, especially following weekends and state holidays when operator offices and regulatory processing may be offline. The lack of new activity in a single daily report does not indicate a trend,...

☀️Morning Wire·Oct 5