WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
DMR Reports No New Bakken Drilling Activity on July 4 - Bakken Wire
Daily Activity

DMR Reports No New Bakken Drilling Activity on July 4

State regulator's daily filing system shows no new permits, spuds, or completions for the holiday.

Bakken Wire Staff·☀️Morning Wire·

The North Dakota Department of Mineral Resources (DMR) reported no new oil and gas activity filings for Friday, July 4, 2026, according to its daily activity report. The system showed no new permits issued, wells spudded, completions reported, or wells plugged.

The DMR's daily activity report is a key source of operational data for the Williston Basin, tracking the lifecycle of wells from initial permitting through to plugging. A day with no new filings is not unusual, particularly on weekends and observed holidays like Independence Day.

Such pauses in reported activity are a normal part of the industry's workflow and administrative calendar. They do not necessarily indicate a slowdown in ongoing field operations but reflect a temporary lull in regulatory filings. Activity typically resumes with the next business day's report.

Source

North Dakota Department of Mineral Resources daily activity report for July 4, Card 2026

dmrdrillingpermitsregulationsnorth dakota

Share this article

Related Articles

Daily Activity

Nine New Bakken Permits Approved, Led by Kraken and Murex

The North Dakota Department of Mineral Resources approved nine new drilling permits on Tuesday, October 6, according to its daily activity report. The bulk of the new permits were filed by Kraken Operating LLC and Murex Petroleum Corporation. Kraken Operating LLC secured four permits for its "BUBBA" project in McKenzie County, all within a confidential field. The permits are for BUBBA 14-11-2 3H, 4H, 5H, and 6H. Murex Petroleum Corporation was approved for four permits in Divide County. Two are in the Alkabo field (BR-CJ HANA 36-24H MB and BR-DANI AUTUMN 36-24H MB) and two are in the Daneville field (BR-MICAH ANDREW 1-13H MB and BR-WANDA JUNE 1-13H MB). The ninth permit went to Koda Resources Operating LLC for the AMBER 1705-6BH well in Divide County's Fertile Valley field. In other activity, several previously confidential wells were released from that status. According to the report, three Hess Bakken Investments II,...

☀️Morning Wire·Oct 7
Daily Activity

Oasis Petroleum Leads Daily Permitting with Six New Dunn County Wells

The North Dakota Department of Mineral Resources approved six new drilling permits on Monday, October 5, 2026, all filed by Oasis Petroleum North America LLC. According to the DMR Daily Activity Report, all six permits are for wells in the Murphy Creek field of Dunn County. The approved permits include four wells on the Potter pad (43369, 43370, 43371, 43372) and two wells on the Weasley pad (43373, 43374). All six permits are located at NE SE 29-145N-95W, indicating a concentrated development plan by the operator in that specific section. Three existing permits were also renewed. According to the report, Formentera Operations, LLC renewed its permit for the RANGER 3328-3TFH well in Lot 4, Section 4-162N-98W, Divide County, Blooming Prairie field. The permit is listed as ‘CONFIDENTIAL’ and its location is noted as being outside of a spacing unit. Two permits held by Koda Resources Operating, LLC in Divide County...

☀️Morning Wire·Oct 6
Daily Activity

DMR Daily Activity Report Shows No New Permits or Filings Sunday

No new oil and gas activity was recorded in North Dakota’s official daily report for Sunday, October 4, according to the state Department of Mineral Resources. The DMR's daily activity report, which tracks regulatory filings from operators, contained no new permits, well completions, spud reports, or notices of plugged wells. The daily report is a key source for tracking near-real-time operational activity in the Bakken formation and broader Williston Basin. It typically includes new permits approved for drilling, notices that a well has been spudded (drilling commenced), reports of well completions (when a well is finished and ready for production), and official notifications of well plugging. Days with no new filings are a normal occurrence in the state's reporting system, especially following weekends and state holidays when operator offices and regulatory processing may be offline. The lack of new activity in a single daily report does not indicate a trend,...

☀️Morning Wire·Oct 5