WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
WTI Crude--
Brent Crude--
Natural Gas--
ND Rig Count--
North Dakota Rig Count Holds Steady at 27 - Bakken Wire
Rig Report

North Dakota Rig Count Holds Steady at 27

Enerplus adds a rig in Williams County while Silver Hill drops one in Mountrail.

Bakken Wire Staff·🌅Afternoon Wire·

The number of active drilling rigs in North Dakota held steady at 27 on Friday, according to Bakken Wire's live rig data. The count saw one addition and one removal, resulting in no net change from the previous day.

Enerplus Resources USA Corporation added the sole new rig, moving the NOBLE 4 into Williams County at location 157-99-11. Meanwhile, Silver Hill Energy Operating, LLC removed the NABORS B27 rig from Mountrail County at 158-94-35. No rigs were reported to have moved locations within the state.

The current activity level represents a slight decrease from one week ago, when the state reported 28 active rigs on June 5, 2026. However, the rig count has shown growth on a longer-term basis, standing three rigs higher than the count of 24 seen one month ago on May 13, 2026.

This steady rig activity continues against a backdrop of ongoing legal and regulatory developments impacting North Dakota's energy sector. On Thursday, North Dakota Attorney General Drew Wrigley announced the final settlement of a lawsuit with the U.S. government over costs related to the Dakota Access Pipeline (DAPL) protests, according to a Bing News report. While the settlement details were not provided in the summary, such resolutions can remove lingering financial uncertainties for the state related to critical infrastructure.

The stability in the rig count suggests operators are maintaining a measured pace of development in the Bakken formation. Williams County, where Enerplus added its rig, has long been a core area of activity within the Williston Basin. The movement of a single rig, as seen with Silver Hill's removal in Mountrail County, is a routine part of field operations as companies complete existing wells and mobilize equipment to new drilling locations.

For royalty owners and service companies, a consistent rig count in the mid-to-high 20s indicates sustained, but not expanding, drilling activity. The current level of 27 rigs provides a baseline for near-term production forecasts and service sector demand across the region.

Source

Bakken Wire Live Rig Data; Bing News reports on DAPL settlement

rig countdrillingenerplussilver hill energywilliams countymountrail countybakkenwilliston basin

Share this article

Related Articles

North Dakota Rig Count Holds at 33; Chevron Restructures Bakken Midstream - Bakken Wire
Rig Report

North Dakota Rig Count Holds at 33; Chevron Restructures Bakken Midstream

North Dakota's active drilling rig count held steady at 33 on Thursday, October 8, 2026, showing no daily change, according to live rig data tracked by Bakken Wire. The count has seen a slight decline from recent levels, down one rig from the 34 active one week ago on October 1, and down two rigs from the 35 active one month ago on September 8. The flat daily activity reported no new rigs added, no rigs removed, and no rigs that moved location. The current level continues a period of stability for the Williston Basin's drilling program, which remains a key indicator of near-term oil production trends in the Bakken formation. The steady rig count unfolds alongside corporate restructuring by a major Bakken operator. According to a report from Rigzone, Chevron has exited its position in Hess Midstream through a swap transaction. The deal will make Hess Midstream independent of...

☀️Morning Wire·Oct 8
North Dakota Rig Count Holds at 33 After Three Rigs Dropped - Bakken Wire
Rig Report

North Dakota Rig Count Holds at 33 After Three Rigs Dropped

The number of active drilling rigs in North Dakota held steady at 33 on Wednesday, October 7, despite three rigs being released by operators, according to live rig data. The net count was unchanged from one week ago on September 30. Three rigs were released from service on Wednesday. Hunt Oil Company released the T&S Drilling 1 rig from a location in Burke County (159-90-33). Devon Energy Williston, L.L.C. released the Noble 4 rig from Dunn County (149-91-18). XTO Energy Inc. released the H & P 429 rig from McKenzie County (153-96-3). No rigs were reported as moving to new locations. The current count of 33 rigs represents a decrease of two rigs from the level seen one month ago on September 7, when 35 rigs were active. The stability over the past week suggests a period of equilibrium in drilling activity, with new rigs being added to replace those...

🌅Afternoon Wire·Oct 7
North Dakota Rig Count Holds at 36, Up Three Over Past Week - Bakken Wire
Rig Report

North Dakota Rig Count Holds at 36, Up Three Over Past Week

North Dakota's active drilling rig count held steady at 36 on Wednesday, October 7, 2026, according to live rig data from Bakken Wire. The data showed no new rigs added, none removed, and no rigs moving location since the prior day. The current count represents a gain of three rigs compared to one week ago, when the state reported 33 active rigs on September 30, 2026. Compared to one month ago, activity is up by one rig from the 35 rigs reported on September 7. A rig count in the mid-30s is consistent with the operational tempo seen in the Bakken formation over recent years, as producers focus capital discipline and efficiency gains in the mature shale play. The stability in the count suggests operators are maintaining, but not aggressively expanding, their drilling programs as of early October. The Williston Basin, home to the Bakken and Three Forks formations, remains...

☀️Morning Wire·Oct 7